The Self Scheduling Access card is used to set up the time frame that the employees assigned to this labor distribution have access to self scheduling. The selection style for self scheduling is also selected, which determines the rules that are validated when the employee enters a schedule through the self-scheduling screen.
Self Scheduling Groups can also be set up on this screen. This feature allows staggering of access to self scheduling, so that certain groups have a specific time frame withing the self-scheduling access period when they can self schedule. For example, Group 1 can schedule the first week, Group 2 can schedule the second week, and Group 3 can schedule the third week. The groups can be set to rotate, so that each group has a turn to be first to schedule.
Profile Parameter Self Scheduling Standard Alpha 1.
Employee Labor Distribution Parameter Self Scheduling Standard Alpha 1. This assignment overrides a Self Scheduling Group assigned to a Profile assigned to an employee.Note: Employees can subscribe to notifications that alert them when the self-scheduling time frame is open to them. For more information, see the Preferences section>My Preferences card>Event Subscriptions>Self Scheduling card.
Steps for Setting up the Self Scheduling Access Card
To set up the Self Scheduling for this staffing configuration, complete the following steps:
Self Schedule Begin Advance Days and
Self Schedule End Advance Days to indicate the first and last days of the time frame (in number of days before a scheduling period begins) that employees will have access to self scheduling.
Self Schedule Review Period End Advance Days field, enter the number of days before the start of the scheduling period that the manager review period will end. The beginning of the manager review period is the same day as the Self Schedule End Advance Days.
Self Schedule Selection Styles field, select the selection style to validate the employee entries. Built into the selection styles are the scheduling rules that are verified when an employee submits a schedule (for example, station and skills, overtime rules, approved hours, etc.).
Allowable Overstaffing field, enter the number of staff that can be scheduled above the staffing needs. For example, when this value is set to '1', employees can self schedule one additional person above the needs.
Allowable Coverage Overstaffing, enter the acceptable variance between the need value and the coverage value for each profile, which will be calculated into staffing hours. For example, if the coverage period is eight hours in length and this value is set to '1', there can be eight additional hours of employee staffing scheduled into the coverage period. This value can be used if the activity code an employee is trying to schedule overlaps another coverage period that does not have any needs.
If the staffing configuration group is using self schedule groups, continue with the Steps for Setting Up a Schedule Group Order Table.