Parent Topic

General

Previous Topic

Next Topic

Book Contents

Book Index

General Tab

The General tab opens a screen to configure the basic information on this staffing configuration record. If adding a new record, click on the Save button after this screen is completed. The other section buttons are then available in the left pane to open additional configuration screens.

When a new record is being created, the Active field can be set to No to indicate it is in "design mode". This prevents the record from being accessed by the system before it is completed.

Depending on the page displayed, the following fields may be available. Click on the link to navigate to the description.

Active

Begin Day of Week

Census Category

Coverage Set Code

Effective Date

Expiration Date

Hours Per Patient Day

Maximum Patients

Number of Acuity Levels

Number of Weeks

Organization Unit

Resume Date

Schedule Period Validation Selection Style

The following additional tabs of information are available in this page:

Self Schedule Tab

Request to Work Tab (StaffConfigurationEdit)

Schedule Incentive Tab

Active

Indicates whether this is a completed, active record (Yes/No). Note: Only one Staffing Configuration record can be Effective at a time, but multiple records can be Active.

Active records are not in effect until the Effective Date has been reached. When a new record is added, the Expiration Date field of the previous record is filled in with the date before the effective date of the next record.

Begin Day of Week

The day of the week that starts the calendar week for this staffing distribution. This is used to determine the schedule population sequence.

Census Category

The Staffing Distribution work sheet used by this organization for recalculating staffing needs. The value entered here determines the work sheet that is available when the Staffing Distributions button is selected in the left pane.

The menu has the following Census Category options:

  • Staffing by Lookup

Loads an alternate staffing matrix based on patient census and acuity.

  • Staffing by Ratios

Calculates the number of staff needed based on patient census and acuity, along with other factors, such as hours per patient day, percentages of care by coverage periods, etc.

  • Staffing by Hours

Uses patient care hour information calculated by a third-party acuity system. These hours are then distributed to specified profiles in the organization.

  • Staffing by Profile

Uses patient care hour information calculated by a third-party acuity system for profile groups. These hours are then distributed to specified profiles within the profile group.

Coverage Set Code

The coverage set used by this Organization Unit, which defines the coverage periods in the staffing grid.

Effective Date

The beginning date this staffing configuration goes into effect.

More About Date Value Fields

Expiration Date

The date this staffing configuration expires (if applicable). If there is no predetermined date that this configuration record will expire, this field should be blank.

More About Date Value Fields

Hours Per Patient Day

The budgeted average number of hours that care givers spend with each patient.

This value is used to calculate staffing needs in the Staffing by Ratios staffing distribution model, and is informational only for the other models.

Maximum Patients

The maximum number of patients that can be accommodated by this staffing distribution. This number is used on the Productivity Hour By Job Class Summary to determine the percent of total beds occupied during the coverage period.

Number of Acuity Levels

The number of patient classification acuity levels that are being used by the Organization Unit. The value entered here determines the number of acuity levels available for configuration for the Staffing Distributions section.

Number of Weeks

The number of weeks in a scheduling period for this organization unit.

Organization Unit

Select the appropriate code for this field. The number of organization unit levels available and the organization unit names displayed depend upon the corporate structure.

Resume Date

The first day of a scheduling period. Using this date and the Number of Weeks field, the system calculates all scheduling periods.

More About Date Value Fields

Schedule Period Validation Selection Style

The selection style used to determine the rules validated when using Minimum Staffing.

For more information, see the Minimum Staffing User Guide in the Feature Set Up Instructions section.