This report shows the schedules of the selected employee types for a six-week date range, displayed on legal sized paper. The report is sorted by labor distribution and then by the sequence determined by the Sort Field. The report shows the employee names, and the employees' scheduled activities are displayed for each day of the schedule. Parameter options determine the information displayed in the grid (activity codes, times, productive/non-productive activities, classes, etc.).
This report has all the same parameter options as the 2 Week Schedule report.